Building Permit Information

Town of Sun Prairie
5556 Twin Lane Road
Marshall, WI 53559

United States of America
 

 

 

 

Building Inspector: Chris Butschke (608-576-6371)
Office Hours: Monday, 9:00 AM to 10 AM
Phone during Office Hours: 837-6688
Phone all other times: 1-800-422-5220
Inspection request number: 1-800-422-5220

Note! Download the Building Permit Fee Schedule PDF HERE

and the Building Permit Information PDF HERE

Prior to applying for a Building Permit in the Town of Sun Prairie you will need to have a zoning permit issued by Dane County Zoning, phone 266-4266. New structures, additions, accessory buildings, garages, pole sheds etc. need a zoning permit. This includes decks and porches. Basically anything which extends the footprint of a structure needs a zoning permit.

New agricultural structures on a farm need to have a site permit, electrical, heating and plumbing permit. Farm is defined as 35 acres or more. New houses, additions and garages on a farm would require a zoning permit and local building permit.

Information Needed for New Residential Construction

* Copy of Driveway Access Permit

* Copy of Zoning Permit issued by Dane County Zoning

* Plot Plan, drawn to scale, showing the lot lines, dimensions and location of all existing and proposed buildings, septic, well, etc. (2 copies)

* 2 Sets of House Plans showing elevations, foundation, floor plan, cross section

* Building Permit Application, including plumbing, electrical, and HVAC permits

* Erosion Control Plan

* Heat Loss Worksheet


Information Needed for Additions, Garages, and Sheds

* Copy of Zoning permit issued by Dane County Zoning

* Copy of Driveway Access Permit (if required)

* 2 Sets of plans (floor plan, cross section)

* Plot Plan, drawn to scale, showing the lot lines, dimensions and location of all existing and proposed buildings, septic, well, etc. (2 copies)

* Building Permit Application, including plumbing, electrical, and HVAC permits

 

 

BUILDING PERMIT FEE SCHEDULE

Effective Date: August 1, 2008

 

A. RESIDENTIAL - 1 & 2 Family

1.    New Dwelling ** Addition

 

$ .11 per sq. ft. all floor area - $75.00 minimum

2.    Erosion Control

 

New $75.00

Addition $50.00

3.    Remodel

 

$6.00 per thousand of valuation

$40.00 minimum

4.    Accessory Structure

 

$.11 per sq. ft. all areas

$40.00 minimum

5.    Occupancy Permit

 

$30.00 per dwelling unit

6.    Temporary Occupancy Permit

$50.00

7.    Pools

 

$40.00

8.    Early Start Permit

 

$50.00 (Footings and Foundations)

9.    Plumbing

 

 

 

1 & 2 Family New Building/Addition/Alteration

(Alterations based on sq. ft. of alteration area)

$35.00 base fee plus $0.035 per sq. ft. all areas

$40.00 minimum

 

Replacement & Misc. Items

$10.00 per thousand of plumbing project valuation

$40.00 minimum

10. Electrical

 

 

           

 

1 & 2 Family New Building/Addition/Alteration

(Alterations based on sq. ft. of alteration area)

$35.00 base fee plus $0.035 per sq. ft. all areas

$40.00 minimum

 

Replacement & Misc. Items

$10.00 per thousand of electrical project valuation

$40.00 minimum

11. HVAC

 

 

 

1 & 2 Family New Building/Addition/Alteration

(Alterations based on sq. ft. of alteration area)

$35.00 base fee plus $0.035 per sq. ft. all areas

$40.00 minimum

 

Replacement & Misc. Items

$10.00 per thousand of HVAC project valuation

$40.00 minimum

12. Razing Fee

 

$50.00 for the first 1000 sq. ft. of floor area and $25.00 per 1000 sq. ft. of floor area thereafter

13. Other

$30.00 minimum

 

 

Getting Inspections

All inspections are handled through Independent Inspections. Call 1-800-422-5220.
Information needed: Permit number, address, contractor's name, type of inspection.
(Note: Please have all the information ready before calling.)

Required Inspections

Building Plumbing
footings (before pouring) underfloor plumbing
foundation (before backfill) rough plumbing
drain tile and subfloor (all plumbing shall be tested)
rough frame

Electrical Heating/Air
temporary service (if applicable) rough ductwork
service panel
rough electrical

Final Inspection

All disciplines shall be inspected. Furnace and water shall be functioning. Ground must be rough graded.